A.1.  South Kalimantan
    •  Coal Port of Asam Asam, South Kalimantan
This port operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. The facilities in Asam Asam Port are as follows: jetty of 1,2 km, berthing dolphin & mooring dolphin, conveyor belt, dust suppression system, reclaimed sampler, stacking conveyor, stockpile with 40 kilo ton, generator House for 4 x 1 mw genset, office port and 4 settling pond.


Asam – Asam Coal Preparation Plant (CPP) and Overland Conveyor (OLC), South Kalimantan


This Project is consist of CPP and OLC of 8,5 km length, in addition of any other supporting facilities. CPP already owned dump station for coal which transported by truck, crushing station to crush coal, stacker, and reclaim tunnel to recollect coal before entering OLC and transported to Coal Port of Asam – Asam. This project operated by PT Nusa Tambang Pratama (NTP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia (AMI)

 

 

 

 

 

 

 


    •    Coal Port of West Mulia, Kintap, South Kalimantan


This port operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. This port also owned a sea facility other than coal handling for processing, transporting, and loading coal to barge. The sea facility is consist of berthing and mooring, truss bridge, offshore platform and shore protection. Coal handling facility owned a capacity of 2,000 tons per hour and will be used for stacking, stockpiling and reclaiming and loading coal to barge.

    •    West Mulia Coal Preparation Plant (CPP) and Overland Conveyor (OLC),

          South Kalimantan


This Project is consist of CPP and OLC of 6,2 km length, in addition of any other supporting facilities. CPP already owned dump station for coal which transported by truck, crushing station to crush coal, stacker, and reclaim tunnel to recollect coal before entering OLC and transported to Coal Port of West Mulia. This project operated by PT Nusa Tambang Pratama (NTP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia (AMI)

 

 


 

 

 

 

 


    •    Continuous Barge Unloader North Pulau Laut Coal Terminal,

          Kota Baru, South Kalimantan


This Project is a coal terminal facility construction in North Pulau Laut, the construction consist of the provision of continuous barge unloader facility, conveyor and marine works, which including of 5 conveyor belt flights, platform jetty, breakwater and causeway. This project operated by PT Nusa Tambang Pratama (NTP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia (AMI)

 

 

 

 

 


    

 

 

 

 

  A.2. East Kalimantan

'
    •    Coal Port of Bengalon, Lubuk Tutung, East Kalimantan


This port operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. The Port of Bengalon has a capcity of 2,000 tons per hour which operated 24 hours a day, with facilities such as hopper, feeder breaker with acapacity of 2,000 tons per hour, conveyor belt, metal detector, magnetic separator, belt scale, sampler plant, sizer 2,000 tons, per hour, stacker, stockpile with capacilty of 80 kilo tons, AC generator, diesel machine, fuel tank, water processor tank, hydrant pump, air pressure tank and port office

 

 

 

 

 

 

 

 

 

 

 


    •   Coal Crusher, Sangatta, East Kalimantan


This Coal Crusher operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. With a capacity 14 million tons coal annually, this Crusher operates 24 hours a day with capacity 2,000 tons per hour. This Crusher packed with hopper, feeder breaker, conveyor belt, metal detector, magnetic separator, sizer, tripper car, sample plant for conveyor, surge bin, sample plant for stockpile, and stockpile with capacity of 125 kilo tons.

.

 

 

 

 

 

 

 

 

 

 


    •    Crushing Plant (CP) and Overland Conveyor (OLC),

         Melawan, East Kalimantan.


This project is consist of crushing station in Melawan with 2 crushing line of coal with average capacity of each line reaching 2,000 tons per hour, OLC of 9,2 km length with 4,000 tons per hour capacity that will transport coal after being crushed in crushing station, transfer tower to be transported to conveyor which then to conveyor CV-06. In addition, the facility is also packed with run of mine pads of 2 x 70,000 tons capacity. This project operated by PT Nusa Tambang Pratama (NTP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia (AMI).
 

 

 

 


 

 

 

 

 


    •    Overland Conveyor (OLC), Tanjung Bara Coal Terminal (TBCT)

         Duplication and Barge Loading Facilities (BLF), Tanjung Bara,

         East Kalimantan.


This project construction of duplication from OLC and TBCT of 12 km length. OLC has a capacity of 4,500 metric tons per hour. OLC and TBCT will transports coal to stockpile before then removed through conveyor belt to BLF and ship loader. This project is also packed with 250 tons surge bin, transfer tower, stacker of 4,500 metric ton per hour capacity reclaimer with average of 7,500 ton per hour, stockpile duplication with huge capacity of 211,400 metric tons, sample tower, marine transfer conveyor and 500 tons surge bin.

Overland Conveyor (OLC)
Overland Conveyor (OLC)

Overland Conveyor (OLC)

Kalimantan Selatan
Kalimantan Selatan

Asam – Asam Coal Preparation Plant (CPP)

Overland Conveyor (OLC)
Overland Conveyor (OLC)

Overland Conveyor (OLC)

1/2
Coal Port of West Mulia Kintap South

Coal Port of West Mulia Kintap South

Pelabuhan Batubara Mulia Barat, Kintap, Kalimantan Selatan

Coal Port of West Mulia Kintap South

Coal Port of West Mulia Kintap South

Pelabuhan Batubara Mulia Barat, Kintap, Kalimantan Selatan

West Mulia Coal Preparation Plant

West Mulia Coal Preparation Plant

, South KalimantanWest Mulia Coal Preparation Plant (CPP) and Overland Conveyor (OLC)

Continuous Barge Unloader North Pulau Laut Coal Terminal (CBU NPLCT)

Continuous Barge Unloader North Pulau Laut Coal Terminal (CBU NPLCT)

Kota Baru, Kalimantan Selatan

Continuous Barge Unloader North Pulau Laut Coal Terminal (CBU NPLCT)

Continuous Barge Unloader North Pulau Laut Coal Terminal (CBU NPLCT)

Kota Baru, Kalimantan Selatan

Pelabuhan Batubara Lubuk Tutung,

Pelabuhan Batubara Lubuk Tutung,

Kalimantan Timur

Pelabuhan Batubara Lubuk Tutung,

Pelabuhan Batubara Lubuk Tutung,

Kalimantan Timur

Coal Crusher Batubara, Sangatta

Coal Crusher Batubara, Sangatta

Kalimantan Timur

Coal Crusher Batubara, Sangatta

Coal Crusher Batubara, Sangatta

Kalimantan Timur

Overland Conveyor (OLC)

Overland Conveyor (OLC)

Melawan, Kalimantan Timur

Overland Conveyor (OLC)

Overland Conveyor (OLC)

Melawan, Kalimantan Timur

Tanjung Bara Coal Terminal

Tanjung Bara Coal Terminal

Overland Conveyor (OLC), Tanjung Bara Coal Terminal (TBCT) Duplication dan Barge Loading Facilities (BLF), Tanjung Bara, Kalimantan Timur

Tanjung Bara Coal Terminal

Tanjung Bara Coal Terminal

Overland Conveyor (OLC), Tanjung Bara Coal Terminal (TBCT) Duplication dan Barge Loading Facilities (BLF), Tanjung Bara, Kalimantan Timur