Mining Infrastructure Services

East Kalimantan

Bahasa

Coal Port of Bengalon, Lubuk Tutung, East Kalimantan

 

This port operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. The Port of Bengalon has a capcity of 2,000 tons per hour which operated 24 hours a day, with facilities such as hopper, feeder breaker with acapacity of 2,000 tons per hour, conveyor belt, metal detector, magnetic separator, belt scale, sampler plant, sizer 2,000 tons, per hour, stacker, stockpile with capacilty of 80 kilo tons, AC generator, diesel machine, fuel tank, water processor tank, hydrant pump, air pressure tank and port office

 

Coal Port Lubuk Tutung,

Coal Port Lubuk Tutung,

East Kalimantan

Coal Port Lubuk Tutung,

Coal Port Lubuk Tutung,

East Kalimantan

Coal Crusher, Sangatta, East Kalimantan

 

This Coal Crusher operated by PT Mitratama Perkasa (MP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia. With a capacity 14 million tons coal annually, this Crusher operates 24 hours a day with capacity 2,000 tons per hour. This Crusher packed with hopper, feeder breaker, conveyor belt, metal detector, magnetic separator, sizer, tripper car, sample plant for conveyor, surge bin, sample plant for stockpile, and stockpile with capacity of 125 kilo tons.

 

 

Coal Crusher, Sangatta

Coal Crusher, Sangatta

East Kalimantan

Coal Crusher, Sangatta

Coal Crusher, Sangatta

East Kalimantan

Crushing Plant (CP) and Overland Conveyor (OLC),

Melawan, East Kalimantan.

 

This project is consist of crushing station in Melawan with 2 crushing line of coal with average capacity of each line reaching 2,000 tons per hour, OLC of 9,2 km length with 4,000 tons per hour capacity that will transport coal after being crushed in crushing station, transfer tower to be transported to conveyor which then to conveyor CV-06. In addition, the facility is also packed with run of mine pads of 2 x 70,000 tons capacity. This project operated by PT Nusa Tambang Pratama (NTP) as the operating company of the Company through PT Astrindo Mahakarya Indonesia (AMI)

Overland Conveyor (OLC)

Overland Conveyor (OLC)

Melawan, East Kalimantan.

Overland Conveyor (OLC)

Overland Conveyor (OLC)

Melawan, East Kalimantan

Tanjung Bara Coal Terminal.

Tanjung Bara, East Kalimantan

 

This project construction of duplication from OLC and TBCT of 12 km length. OLC has a capacity of 4,500 metric tons per hour. OLC and TBCT will transports coal to stockpile before then removed through conveyor belt to BLF and ship loader. This project is also packed with 250 tons surge bin, transfer tower, stacker of 4,500 metric ton per hour capacity reclaimer with average of 7,500 ton per hour, stockpile duplication with huge capacity of 211,400 metric tons, sample tower, marine transfer conveyor and 500 tons surge bin.

Tanjung Bara Coal Terminal

Tanjung Bara Coal Terminal

Tanjung Bara, East Kalimantan

Tanjung Bara Coal Terminal

Tanjung Bara Coal Terminal

Tanjung Bara, East Kalimantan